Thisassignment consists of two (2) sections: a business requirementsdocument and a Gantt chart or project plan. You must submit bothsections as separate files for the completion of this assignment. Labeleach file name according to the section of the assignment for which itis written. Additionally, you may create and / or assume all necessaryassumptions needed for the completion of this assignment.
Procuringquality business requirements is an important step toward the design ofquality information systems. Completion of a quality requirementsdocument allows user needs and expectations to be captured so thatinfrastructure and information systems can be designed properly. Usingthe requirements document provided in the course shell, you are tospeculate on the needs of the company. You must consider current andfuture requirements; however, assumptions should be realistic andcarefully considered.
Section 1: Business Requirements Document
1. Write an eight to ten (8-10) page original business requirements document for the project plan using the template provided. Note: The template can be found in the Student Center of the online course shell.
a. Describe the project including the following:
i. Describe the scope and analyze how to control the scope.
ii. Identify possible risks, constraints, and assumptions.
iii. Describe the integration with other systems and infrastructure. Note: Database and interface design, security, and networking should be considered.
iv. Define relevant terms that will be used throughout project.
b. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
This course requires use of Strayer Writing Standards (SWS).The format is different than other Strayer University courses. Pleasetake a moment to review the SWS documentation for details.
Includea cover page containing the title of the assignment, the student’sname, the professor’s name, the course title, and the date. The coverpage and the reference page are not included in the required assignmentpage length.
Section 2: Revised Gantt Chart / Project Plan
Use Microsoft Project or an open source alternative, such as Open Project, to:
2.Update the Gantt chart or project plan (summary and detail) template,from Project Deliverable 1: Project Plan Inception, with all the projecttasks.