IT 510 SNHU Security System Upgrade Proposal Project Assignment
Submit a project plan. The project plan is a Word document that is a combination of a written explanation of the project plan and the explanation of the control plan. The WBS (Work Breakdown Structure) and timeline are represented with screenshots of the Gantt chart, resource chart, and cost table. Ensure each chart and graph is properly noted and has text explanation.
Note that the course project intent is to introduce students to an entire systems analyst process. Each milestone is fairly significant in size if performing an actual project. For the intended learning and exposure to the course project topics, please know that assumptions will have to be made and that any such assumptions should be documented.
For additional help, attached is a copy of the original business proposal.
For additional details, please refer to the Final Project Document and the Milestone Two Guidelines and Rubric document.
“Place your order now for a similar assignment and have exceptional work written by our team of experts, guaranteeing you A results.”
Attachments
20190405000647security_system_upgrade_business_case_proposal (22 kB)